Our VIP fee includes:
- Evaluating any air in the the tank using our nose-o-meter.
- Internal inspection of your tank bottom, walls, neck & threads.
- Verifying your useable thread count is within specifications for the type of tank.
- A thorough evaluation of the outside of the tank.
- Removing the boot and old VIP stickers to verify there is no rust or pitting hiding underneath.
- Removing any corrosion or used lubricant present in the valve threads.
- Lubricating the valve threads and replacing the tank O-ring (we use oxygen compatible Viton o-rings)
- A VIP sticker indicating the tank is ready for use.
- Logging your tank serial # into our database to track any areas of note.
- Sending reminder e-mails when your tank is due for another VIP inspection.
- Air fill included (EANx is additional).
Our hydrostatic fee includes:
- Cylinder is checked by filling with water and pressurizing the tank to 1.6 times of the rated pressure.
- Tank expansion is measured and compared to the allowable ratings for that tank type & material.
- If tank passes the test, a new hydro date is permanently stamped into the tank.
- Tank is undergoes our visual inspection process.
- New VIP sticker is affixed to tank exterior.
- Air fill included (EANx is additional).
Our Valve Service includes:
- Valve is removed from tank and disassembled.
- Valve components are cleaned in ultrasonic bath.
- Valve o-rings are replaced and lubricated.
- Valve re-affixed to cylinder.
- Tank pressurized and checked for leaks.
- Air fill included (EANx is additional).
Our Doubles Servicing includes:
- Manifold, Valves, Bands have current positioning marked then removed from tanks.
- All parts are thoroughly inspected for rust, dirt, operability and readiness.
- Valve o-rings are replaced and lubricated.
- Manifold, valves and bands are reassembled back to original locations.
- System pressurized and checked for leaks.
- Air fill included (EANx is additional).
Our O2 cleaning fee includes:
- Removing & disassembling valve.
- Valve components are cleaned in ultrasonic bath.
- Valve o-rings are replaced and lubricated.
- Tank is visually inspected.
- Tank is cleaned using consumption safe cleaning agents.
- Valve & tank are reassembled.
- O2 clean service sticker affixed.
- Air fill included (EANx is additional).